|
Project documents are available to the general public in a downloadable PDF format as the project moves forward. Check the list below for current listings. Throughout the process, hard copies of these documents can be purchased from the RCTC office as they are prepared.
RCTC Office
4080 Lemon Street, 3rd Floor
Riverside, CA 92502
Phone: (951) 787-7141
Fax: (951) 787-7920
PVL Environmental Impact Report Volume 1 (44.9 MB)
PVL Environmental Impact Report Volume 2 (35.3 MB)
Appendices
Appendix A (24 KB)
Appendix B (1.4 MB)
Appendix C (63 KB)
Appendix D (75 KB)
Appendix E (14 KB)
Technical Reports
Technical Report A (5.3 MB)
Technical Report B (407 KB)
Technical Report C (1.9 MB)
Technical Report D (2.0 MB)
Technical Report E (3.8 MB)
Technical Report F (480 KB)
Technical Report G (1.0 MB)
Technical Report H (400 KB)
Resolution No. 11-013 (400 KB)
Supplemental Environmental Assessment (SEA) and Section 4(f) Evaluation, November, 2010 (31.5 MB)
Appendices (418 KB)
Technical Reports
Technical Report A: San Jacinto Branchline/I-215 Corridor Study Alternatives Analysis (4.6 MB)
Technical Report B: Air Quality Technical Report (2.9 MB)
Technical Report C: Noise and Vibration Technical Report (29.1 MB)
Technical Report D: Traffic Technical Report (18.7 MB)
Technical Report E: Habitat Assessment Report (8.5 MB)
Technical Report F: Jurisdictional Determination (15.1 MB)
Technical Report G: Hazardous Materials Corridor Study – SJBL Segment (76.3 MB)
Technical Report H: Phase I ESA (111.4 MB)
Accessibility Compliance with USDOT Level Boarding Guidance, Draft, September 24, 2010 (10 MB)
Appendices
Appendix A: SCRRA Comments to USDOT — Transportation for Individuals with Disabilities (1.5 MB)
Appendix B: Association of American Railroads Comments to USDOT — Transportation for Individuals with Disabilities (795 KB)
Appendix C: ADA Accessibility Compliance “Key Stations” Plan (July 1992) (2.5 MB)
Appendix D: FTA Letter to SCRRA Regarding ADA Compliance (57 KB)
Appendix E: 49 Code of Federal Regulations (CFR) 37.9 — Standards for Accessible Transportation Facilities (61 KB)
Appendix F: Accessibility Survey for Metrolink’s Perris Valley Line Extension (1.1 MB)
Appendix G: CPUC General Order 26-D: Railroad Clearances) (86 KB)
Appendix H: BNSF Letter (2.7 MB)
Draft Environmental Impact Report (EIR), April 5, 2010 (33.1 MB)
Appendices
Appendix A: Draft IS/MND Comment Matrix (23.1 KB)
Appendix B: Notice of Preparation and Initial Study Checklist (617.2 KB)
Appendix C: Grade Crossing Modifications Table (63.6 KB)
Appendix D: LESA Model Calculations (74.1 KB)
Appendix E: Agency Communication Log (13.5 KB)
Technical Reports
Technical Report A: San Jacinto Branchline/I-215 Corridor Study Alternatives Analysis (4.5 MB)
Technical Report B: Air Quality Technical Report (2.7 MB)
Technical Report C: Noise and Vibration Technical Report
Sections I – III (1.7 MB)
Appendix A (9.1 MB)
Appendix B (4.0 MB)
Appendix C – E (2.4 MB)
Appendix F (14.5 MB)
Technical Report D: Traffic Technical Report
Sections A – G (2.8 MB)
Appendix A – B (998.2 KB)
Appendix C (13.8 MB)
Appendix D – F (4.3 MB)
Technical Report E: Habitat Assessment Report (8.3 MB)
Technical Report F: Jurisdictional Determination (28.6 MB)
Technical Report G: Hazardous Materials Corridor Study — SJBL Segment
Sections 1.0 – 5.0 (563.7 KB)
Table 8 (198.7 KB)
Sections 6.0 – 8.0 (45.5 KB)
Plates (3.2 MB)
Appendices (30.9 MB)
NOA and NOC
Notice of Availability for a Draft Environmental Impact Report (88.7 KB)
Notice of Completion and Environmental Document Transmittal (438.8 KB)
Project Newsletter, December 2010 (578 KB)
Project Newsletter, March 2010 (836 KB)
Project Newsletter, January 2009 (1.3 MB)
Project Newsletter, May 2008 (677 KB)
Perris Valley Line Locally Preferred Alternative PDF (350 KB)
|